Chapter 5 Form District Regulations Part 3 Suburban Form Districts Page 1 of 4
5.3.1 Neighborhood Form District
| Goals | Objectives | Plan Elements |
| Community Form Goals C1, C2, C3, C4 |
Community Form Objectives C1.1, C1.2, C2.1, C2.2, C2.3, C2.4, C2.5, C2.6, C2.7, C3.1, C3.4, C3.5, C3.6, C3.7, C4.1, C4.2, C4.3, C4.4, C4.5, C4.6, C4.7 |
Guidelines 1, 2, 3, 4, 7 and 9 |
| NOTE: There are no infill standards for rear yard
setbacks for residential development, refer to Table 5.3.1 for required rear
yard setbacks for residential development. NOTE: refer to 5.4.2 B for standards on major subdivions along collector and arterial roadways. |
| Zoning District |
Railroad Expressway and Hazardous Transportation Pipelines |
Arterial and Collector |
| RR through R-5 (PD district (single family residential use) |
20 feet | 15 feet |
| R-5A through U-N (PD District multi- family residential use) |
15 feet | 10 feet |
| R-7 and above | 15 feet | 0 feet |
| Note: Permitted rear yard encroachments for residentially used structures as listed within Chapter 5, Part 4 are not permitted within a setback for regional transportation pipeline easements. |
| Zoning District | Minimum Lot Area | Min. Lot Width | Min. Front and Street Side Yard Setback | Minimum Side Yards (Each) | Minimum Rear Yard Setback | Maximum Building Height |
| RR | 5 Acres | 150 ft | 30 ft | 15 ft | 50 ft | 35 ft |
| RE* | 105,000 sf | 150 ft | 90 ft (front); 60 ft (street side) | 20 ft minimum, 50 ft total |
50 ft | 35 ft |
| R-E, R-1 |
40,000 sf | 150 ft | 75 ft (front); 25 ft (street side) |
15 ft minimum, 45 ft total |
25 ft. | 35 ft |
| R-2 | 20,000 sf | 100 ft | 30 ft | 10 ft minimum, 30 ft total |
25 ft. | 35 ft |
| R-3 | 12,000 sf | 75 ft | 30 ft | 7.5 ft minimum, 22.5 total |
25 ft. | 35 ft |
| R-4 | 9,000 sf | 60 ft | 30 ft | ** | 25 ft. | 35 ft |
| R-5 | 6,000 sf | 50 ft | 25 ft | 5 ft | 25 ft. | 35 ft |
| PRD | 1500 sf | 0 ft. | 0 ft. | 0 ft. | 0 ft. | 35 ft. |
| R-5A | 6,000 sf | 50 ft | 20 ft | 5 ft | 25 ft. | 35 ft |
| R-5B | 6,000 sf | 30 ft | 20 ft | 3 ft | 25 ft. | 35 ft |
| R-6, OR | 6,000 sf | 25 ft | 15 ft | 3 ft | 25 ft. | 35 ft |
| U-N | 2,500 sf 1500 sf if attached |
18 ft | 15 ft | 3 ft | 6 ft. | 35 ft |
| R-7, OR-1 |
6,000 sf | 25 ft | 15 ft | 3 ft | 15 ft | 45 ft (see footnote)*** |
| R-8A, OR-2, CR, CN |
6,000 sf | 25 ft | 15 ft | 3 ft | 15 ft | 45 ft (see footnote)*** |
| OR-3, OTF, C-1, C-2 |
5,000 sf | None | None | None | 15 ft | 45 ft (see footnote)*** |
| .Note: The PDD shall use the dimensional standards of the
zoning district uses as listed in Table 2.8.2. * as in effect in Anchorage, Douglass Hills and Shively; for standards in effect in other jurisdictions, refer to next line of table. **For lots created prior to August 22, 2000, and lots shown on preliminary plans approved prior to that date, the side yards shall be minimum 6, total of 18; for lots created or shown on preliminary plans approved after that date, the side yards shall be 5 on each side. *** Additional height is allowed, if all required setbacks are increased five feet for each additional ten feet of building height, or fraction thereof, over 45 feet. This extra setback does not apply to off-street parking and maneuvering areas. Non-residential uses are subject to building height limits as established in Table 5.3.2 |
| Maximum Building Footprint | Min. Front and Street Side Setback | Max. Front and Street Side Setback | Non-Res to Res Setback (No Loading)1 | Non-Res to Res Setback (Loading)2 | Max. Building Height | Max Building Height: Residential Top Floor3 |
| 5,000 sq ft | 10 ft | 80 ft. | 15 | 25 | 25 ft | 35 ft. |
| 5,001 to 30,000 sq ft |
10 ft. | 80 ft. | 30 | 50 | 30 ft. | 40 ft. |
| 30,001 to 80,000 sq ft |
10 ft | 150 ft. | 50 | 75 | 35 ft | 45 ft. |