Chapter 11 Development Review Procedures Part 6
Development Plans
11.6.1 Development Plan Categories
For purposes of review procedure, developments are divided into
three distinct categories based upon the size thresholds established in the
Form District regulations applicable to the location of the proposed
development. The categories are:
- Category 1 - Development proposals
which do not meet the size threshold for applicability of Form District design
standards.
- Category 2 - Development proposals
which meet the minimum size threshold for applicability of Form District design
standards but do not meet the size threshold for completing the Community
Design Review process.
- Category 3 - Development proposals
which meet the size threshold for completing the Community Design Review
Process.
The review process for each category of development is outlined
in the sections below. Initial or revised submissions shall follow the
procedure determined by the size of the new or additional development proposed
unless a higher level of review is required by another section of this
code.
| NOTE: Plans filed before the effective date of the LDC
shall be reviewed for compliance with the regulations in effect at the time of
filing. See Section 1.1.8 |
11.6.2 Category 1 Review Procedure
Prior to issuance of building permits, the local building
official shall assure the plan is in compliance with the applicable provisions
of this code and all binding elements and conditions of approval. These
provisions include but are not limited to: allowable uses; yard and setback
requirements; height; landscaping; environmental assessment; and parking. In
cases in which the building official has reason to question the development
plans compliance with any provision of the Land Development Code,
applicable binding elements and conditions of approval, the building official
may forward the development plan to the Planning Director for a review and
action on the plan.
11.6.3 Category 2 Review Procedure
- Application for Planning Director Approval
Applications for Category 2 development approval shall be submitted on forms
supplied by the department. Applications shall be signed by the property owner
or his/her agent and filed with Planning and Design Services. Applications
shall be accompanied by supporting material determined appropriate by the
Planning Director and by the appropriate fee. The list of required supporting
materials shall be available from the offices of Planning and Design Services.
Failure to submit all required material may result in delay of the application
review. At a minimum, the application shall be accompanied by a development
plan of sufficient detail to demonstrate to the Planning Director that the
proposed development is in compliance with the applicable requirements of these
regulations and any applicable binding elements or conditions of approval. The
Planning Director shall approve the proposed development if it complies with
the requirements of this code; associated binding elements, if any; and other
applicable law. In cases in which the Planning Director has reason to question
the development plans compliance with any provision of the Land
Development Code, applicable binding elements and conditions of approval, the
Director may forward the development plan to the Planning Commission, or
designated committee thereof, for review and action on the plan.
- Issuance of Building Permits
In addition to those
materials required by the appropriate building code, applications for permit
for construction activity meeting the Category 2 thresholds shall be
accompanied by a development plan which has been approved by the Planning
Director. Building permits for Category 2 development shall be issued only in
conformance with the development plan approved by the Planning Director and any
applicable binding elements or conditions of approval of a district development
plan.
| Note: Category 2 procedure outlined within PDS
information handout |
11.6.4 Category 3 Review Procedure
- Commission Approval Required
In addition to those
materials required by the appropriate building code, applications for permit
for construction activity meeting the Category 3 thresholds shall be
accompanied by a development plan, which has been approved by the Planning
Commission under the Community Design Review Procedure outlined below. The
Planning Commission may delegate this review process to a Committee of the
Commission. The Technical Review Committee process defined in Chapter 7 shall
satisfy the Community Design Review Process required for subdivisions that meet
the threshold established in the form district regulations. In conjunction with
its review of development proposals that require Conditional Use Permits or
Variances, the Board of Zoning Adjustment is authorized to review and approved
Category 3 reviews in accordance with this part.
- Community Design Review Process
- Application Required - Applications for development plan
approval shall be submitted on forms supplied by the department. Applications
shall be signed by the property owner or his/her agent and filed with Planning
and Design Services in accordance with these regulations and the Planning
Commission By-Laws and Rules of Procedure. Applications shall be accompanied by
supporting material determined appropriate by the Planning Director and by the
appropriate fee. The list of required supporting materials shall be available
from the offices of the Commission. Failure to submit all required material may
result in delay of the application review.
- Notice Not less than 10 calendar days prior to
the proposed review session, notice of the proposed development and its
scheduled review shall be given to adjoining property owners. In addition,
staff shall endeavor to assure that notice is given to all neighborhood groups
who have registered to receive notice of development applications.
- Review Session Review of and action on the
proposal shall take place in a public meeting before the Planning Commission or
Committee thereof. No less than ten (10) calendar days prior to an original or
continued review session date, the applicant shall submit original or revised
development plans, studies, reports, etc. which have been prepared in response
to comments received during the review process. This section does not preclude
the applicant from presenting, at the review session, changes to the plan in
response to concerns of the neighbors, agency review staff or the Planning
Commission. The Planning Commission or designated Committee shall approve the
proposed development if it complies with the requirements of this code;
associated binding elements, if any; and other applicable law.
-
| For example, if a site plan for a 300 unit apartment
complex is approved under the Category 3 process, building permits for each 10
unit building may be issued without additional Category 3 review. |
Issuance of Building Permits
In addition to
those materials required by the appropriate building code, applications for
permit for construction activity meeting the Category 3 thresholds shall be
accompanied by a development plan which has been approved by the Planning
Director. Building permits for Category 3 development shall be issued only in
conformance with the development plan approved by the Planning Director and any
applicable binding elements or conditions of approval of a district development
plan.
- Multiple Phase Projects
Developments that are
constructed in multiple phases shall not be required to undergo the Category 3
review procedure more than once. If a plan has been approved in accordance with
this section, building permits for construction of portions of the approved
development may be issued without additional Category 3 review.
11.6.5 Plan Certain Development Plans
Note: See section 11.4.6 Plan Certain Development